Scroll Top

Apartment for sale in a new building in Sofia, Druzhba 1 neighborhood

City
Sofia
Type
Apartment, New building
Price

88 522.00 €

Offer No
PROP0011
Area

180 m²

We would like to offer you an apartment for sale in a building under construction in the Druzhba neighborhood, near main boulevards leading to the city center and Sofia Airport. This district of Sofia is currently in full development and is rapidly evolving into a residential area. It offers the advantage of living in a peaceful environment, whilst having many shops and supermarkets near-by as well as ensuring quick access to the city center thanks to multiple available routes. The property has the following layout: entrance hall, living room with kitchenette, a bedroom, a bathroom with WC, a shower room with WC, storage room and balcony. It is possible to buy an underground garage as well as an outdoor parking space.

The state of finishing of the apartment is as follows: wall and floors ready for the laying of finishing materials, armored entrance door installed, triple glazed PVC, plumbing, electrical installation and sockets.

The ground floor apartments have a courtyard, which is included in the price. Landscaping work will be done in a fenced yard with controlled access. From the main entrance where the stairwell and elevator are located, the construction of a separate entrance is planned, which will lead towards a leisure room. The roadway for the entry of vehicles, as well as the parking area are made out of waxed concrete. All the remaining exterior surface is planned to be used for landscaping and embellishment of the common areas.

The thermal insulation of the facade is made out of 100 mm polystyrene. The interior walls are 12 and 25 cm thick with ceramic bodies that meet sound and thermal insulation requirements, as well as fire protection regulations. The interior doors are made out of medium density laminated fiber. The entrance doors are made out of metal, hence providing protection against burglary and fire. In all the common areas, the floor is covered with granite. The end of the construction work and the commissioning of the building are scheduled for 2023.

  • Bedrooms:
    1
  • Furniture:
    No
  • Elevator:
    Yes